THE RAILWAY STRIKE
RESUMPTION OF WORK IN WALES TRAFFIC DISORGANISED IN LONDON London, September 27. .There has been a fairly general iosiimption »if work in Wales. Meetings of the Great Eastern ami tho London and North-western drhers and firemen decided to resume, but London traffic is still disorganised.—Aus.-N.Z. Cablo Assn. ALLfcbAllONd AGAINST PACIFISTS SAID TO HAVE ENGINEERED THE STRIKE. ■' London, September 27. It is stated that an inquiry will be held into allegations that the South Wales railway strike was engineered by pacifists, who duped the men by false statements, and who attempted, to prevent Mr. Thomas personally reaching the strikers, and also used coded mes-sages.—Aus.-N.Z. pable Assn, ILiUci Mill iAKUj MluliiSKo MUST RETURN TO WORK OR FIGHT. (Rec. September 29, 5.5 p.m.) London, September 27. The Press Bureau states: The Government has notified tho Clyde strikers that tinless work is renimed on October 1 protection certificates will bo withdrawn and the Military Service Acts immediately enforced.—Aus.-N.Z. Gable Assn.-Reuter.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/DOM19180930.2.31
Bibliographic details
Ngā taipitopito pukapuka
Dominion, Volume 12, Issue 4, 30 September 1918, Page 6
Word count
Tapeke kupu
159THE RAILWAY STRIKE Dominion, Volume 12, Issue 4, 30 September 1918, Page 6
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the Dominion. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.