RAETIHI MAIN TEUNK RAILWAY
By Telegraph—Press Association. Raotlhi, January 14. At Raetihi tliia morning the Minister of Public Works met a deputation which urged the immediate completion of the I!actilii Main Trunk Railway line. The Minister, in reply, said there was no intention of stopping the work 011 the line, but that there was difficulty in obtaining labour and material. -The first half of the line would, however, be pushed <m with all the expedition that was possible, and it would bo ready and open for traffic in about four months time; the remainder of the lino would be proceeded with, but it was not anticipated that progress on this section would be so raoid as that 011 the now unfinished portion of the first section.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/DOM19160115.2.66
Bibliographic details
Ngā taipitopito pukapuka
Dominion, Volume 9, Issue 2669, 15 January 1916, Page 12
Word count
Tapeke kupu
126RAETIHI MAIN TEUNK RAILWAY Dominion, Volume 9, Issue 2669, 15 January 1916, Page 12
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the Dominion. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.