Thank you for correcting the text in this article. Your corrections improve Papers Past searches for everyone. See the latest corrections.

This article contains searchable text which was automatically generated and may contain errors. Join the community and correct any errors you spot to help us improve Papers Past.

Article image
Article image
Article image
Article image
Article image
Article image

New Bridge To Be Built Over Taieri River

•The Press" DUNEDIN, May 16. A new bridge to be bull' over the Taieri river a Otokia will be more than on< quarter of a mile long. Con struction is likely to begii next year. To be part of the Otokia Waihola flood-free deviatior of the Main South highway the bridge will carry traffii travelling south from Otokii across the Taieri river t< behind the floodbank wbicl protects West Taieri. The new aecticn of highway will extend five miles acros the plain behind the flood bank parallel to the existini railway line. Approaching Titri, it wil cross the Waipori river by i bridge already under con struction and return to thi present highway just short o the Titri station. The total cost of the devia tion has been estimated a £400,000.

Special Service The structure would span not- only, the river, but also the flood plain on either side, said Mr S’. F. Reynolds, Ministry of Works resident engineer in Dunedin. It would last many years, and discussions were being held with the Otago Catchment Board concerning the area of the water-way likely to be left for floods during its , life. Test homing and drilling were still going on for design purposes, but indications were t that the structure would be . on precast piles and beams ; like the Waipori river bridge. If finance were available. ■ construction would begin next 1 year.

Permanent link to this item
Hononga pūmau ki tēnei tūemi

https://paperspast.natlib.govt.nz/newspapers/CHP19610517.2.80

Bibliographic details
Ngā taipitopito pukapuka

Press, Volume C, Issue 29515, 17 May 1961, Page 11

Word count
Tapeke kupu
239

New Bridge To Be Built Over Taieri River Press, Volume C, Issue 29515, 17 May 1961, Page 11

New Bridge To Be Built Over Taieri River Press, Volume C, Issue 29515, 17 May 1961, Page 11

Help

Log in or create a Papers Past website account

Use your Papers Past website account to correct newspaper text.

By creating and using this account you agree to our terms of use.

Log in with RealMe®

If you’ve used a RealMe login somewhere else, you can use it here too. If you don’t already have a username and password, just click Log in and you can choose to create one.


Log in again to continue your work

Your session has expired.

Log in again with RealMe®


Alert