NEW CATHEDRAL FOR AUCKLAND.—Embraced by a web of boxing and scaffolding, the sanctuary and chancel of the new Cathedral of the Holy Trinity at Auckland, is taking shape. The nave is at present being designed and work on this will start later. The part now being built is expected to be completed in about two years and a half.
Permanent link to this item
Hononga pūmau ki tēnei tūemi
https://paperspast.natlib.govt.nz/newspapers/CHP19610503.2.168
Bibliographic details
Ngā taipitopito pukapuka
Press, Volume C, Issue 29503, 3 May 1961, Page 17
Word count
Tapeke kupu
59NEW CATHEDRAL FOR AUCKLAND.—Embraced by a web of boxing and scaffolding, the sanctuary and chancel of the new Cathedral of the Holy Trinity at Auckland, is taking shape. The nave is at present being designed and work on this will start later. The part now being built is expected to be completed in about two years and a half. Press, Volume C, Issue 29503, 3 May 1961, Page 17
Using this item
Te whakamahi i tēnei tūemi
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
Ngā mihi
This newspaper was digitised in partnership with Christchurch City Libraries.